How To Change The Mold - Step 3 : Install The Forming Mold
Home » Service » Installation And Debugging Video » Container Forming Filling Sealing Machine » How To Change The Mold - Step 3 : Install The Forming Mold

loading

How To Change The Mold - Step 3 : Install The Forming Mold

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
  • GDS-118P5

  • Migrand

Availability:

How To Change The Mold of FFS Machine


Step 1:Preparations before mold removal


Step 2: Remove the mold


Step 3: Install the forming mold


4 seconds:First loosen the two tension springs in the rear compartment of the machine.


14 seconds:The middle shaft of that fix screw rod is taken as the center when the back forming mold is installed


33 seconds:After the mold is against the flat base, lock the mold set screws.


56 seconds:Install the forming die alignment plate (included in the toolbox)。


1 minute 6 seconds:Taking the level of the lower guide rail as a base line, aligning the bottle body step of the forming rear mold


2 minute 6 seconds:The position of the upper guide rail is adjusted according to the height of the bottle, and the distance between the height of the bottle and the guide rail is the same.


2 minute 18 seconds:Rail adjustment screw


2 minute 27 seconds:After the lower guide rail is adjusted, do not move it, just adjust the upper guide rail.


2 minute 40 seconds:The width of the guide must not be too tight or too loose.Ensure that the bottle is pulled smoothly and does not fall off.


3 minute 2 seconds:When installing the molding blowing module, align the side of the mold with the alignment line of the blowing block to ensure that the air hole is installed in the middle of the mold.


3 minute 25 seconds:The for front mold is arranged on that for mold fixing plate.The side of the retainer plate with the two screw holes faces the right side of the machine.


3 minute 41 seconds:Install the fixing screw into the fixing plate, align the fixing plate with the screw step, and lock the fixing plate.


3 minute 59 seconds:Tighten the retaining nut


4 minute 20 seconds:When the forming front mold is installed, the rear mold moves forward to align the bottom of the forming front mold with the lower positioning plate of the rear mold.


4 minute 20 seconds:Align the left and right edges of the front and rear molds, and then tighten the fixing screws.


4 minute 53 seconds:After installation, remove the mold alignment plate.


Other steps click to---->


Service

Online technical service available:

1. Lifelong free online technical service is provided to users who have bought machine from our company.
2. Paid online technical service is also provided to users who haven't bought machine from our company, which are charged between US $100-5000 according to the service difficulty level.
3. The payment is collected in deposit and balance. A full refund will be made if the problem is not resolved.
Product Inquiry

or Whatsapp/Wechat ID

On the basis of more than 20 years of manufacturing technology, we always adhere to the principle of customer first, do every detail work in the spirit of craftsmanship, and provide the most timely and effective after-sales service.
Hunan Grand Packing Machinery Co.,Ltd( with Hunan Grand International Trade Co.,ltd as the marketing and exporting company) is specialized in the pharmaceutical and packing machinery for almost 20 years, such as plastic ampoule forming filling and sealing machine, capsule filling machine, blister packing machine, strip packaging machine, cartoning machine etc.

Product Category

Contact Us

Tel: +86-731 84325468   +86-731 84325498
Mobile/Wechat/Whatsapp: +86-13787413551
Email: sales@grand-packing.com

Newsletter

Get all the latest information on Events, Sales and Offers. Sign up for newsletter today.
Copyright© 2022 Hunan Migrand Machinery Technology Co.,Ltd. All Rights Reserved.  湘ICP备2022022001号-1  Sitemap | Privacy Policy | Support By Leadong