How To Change The Mold - Step 4 : Install the heat sealing mold and the scrap cutter
Home » Service » Installation And Debugging Video » Container Forming Filling Sealing Machine » How To Change The Mold - Step 4 : Install the heat sealing mold and the scrap cutter

loading

How To Change The Mold - Step 4 : Install the heat sealing mold and the scrap cutter

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
  • GDS-118P5

  • Migrand

Availability:

How To Change The Mold of FFS Machine


Step 1:Preparations before mold removal


Step 2: Remove the mold


Step 3: Install the forming mold


Step 4: Install the heat sealing mold and the scrap cutter


5 seconds:Install the filling head holder, do not tighten now


37 seconds:The electric heating tube is inserted into the back heat sealing mold, and the screws of the power cord are tightened


50 seconds:Fix the post-heat-seal module without tightening it first。


1 minute 14 seconds:The bottom of the rear heat sealing mold is 2-3mm higher than the upper guide rail, and then tighten it.


1 minute 52 seconds:Install the front heat-sealing mold, insert the heating tube, install the front heat-sealing mold fixing plate into the fixing screw, and align the screw step。


2 minute 8 seconds:Tighten the heating pipe wire nut


2 minute 17 seconds:Tighten the retainer plate nut


2 minute 48 seconds:Align the front and rear heat sealing plates up and down and left and right, and then tighten the fixing nuts of the heat sealing plate


3 minute 7 seconds:After the heating tube is completely pushed into the heating plate, lock the front and rear heating tube.


3 minute 22 seconds:Restore the tension spring in the rear nacelle


3 minute 33 seconds:Installation of rear waste edge punch mold,


3 minute 48 seconds:Align the cutting mold fixing plate with the top of the back plate and tighten the screws.


4 minute 1 seconds:When installing the cutting mold, install the copper bearing in the shaft sleeve and leave half of it.。


4 minute 13 seconds:Align the pattern of the front and rear cutting mold, otherwise the knives will be damaged.lock the fixing screw.


4 minute 24 seconds:Lock nut。


4 minute 35 seconds:Check and connect the air pipe and water pipe of each module


Other steps click to---->


Service

Online technical service available:

1. Lifelong free online technical service is provided to users who have bought machine from our company.
2. Paid online technical service is also provided to users who haven't bought machine from our company, which are charged between US $100-5000 according to the service difficulty level.
3. The payment is collected in deposit and balance. A full refund will be made if the problem is not resolved.
Product Inquiry

or Whatsapp/Wechat ID

On the basis of more than 20 years of manufacturing technology, we always adhere to the principle of customer first, do every detail work in the spirit of craftsmanship, and provide the most timely and effective after-sales service.
Hunan Grand Packing Machinery Co.,Ltd( with Hunan Grand International Trade Co.,ltd as the marketing and exporting company) is specialized in the pharmaceutical and packing machinery for almost 20 years, such as plastic ampoule forming filling and sealing machine, capsule filling machine, blister packing machine, strip packaging machine, cartoning machine etc.

Product Category

Contact Us

Tel: +86-731 84325468   +86-731 84325498
Mobile/Wechat/Whatsapp: +86-13787413551
Email: sales@grand-packing.com

Newsletter

Get all the latest information on Events, Sales and Offers. Sign up for newsletter today.
Copyright© 2022 Hunan Migrand Machinery Technology Co.,Ltd. All Rights Reserved.  湘ICP备2022022001号-1  Sitemap | Privacy Policy | Support By Leadong