loading
GDS-118P5
Migrand
Availability: | |
---|---|
| |
How To Change The Mold of FFS Machine
Step 1:Preparations before mold removal
Step 3: Install the forming mold
Step 4: Install the heat sealing mold and the scrap cutter
5 seconds:Install the filling head holder, do not tighten now
37 seconds:The electric heating tube is inserted into the back heat sealing mold, and the screws of the power cord are tightened
50 seconds:Fix the post-heat-seal module without tightening it first。
1 minute 14 seconds:The bottom of the rear heat sealing mold is 2-3mm higher than the upper guide rail, and then tighten it.
1 minute 52 seconds:Install the front heat-sealing mold, insert the heating tube, install the front heat-sealing mold fixing plate into the fixing screw, and align the screw step。
2 minute 8 seconds:Tighten the heating pipe wire nut
2 minute 17 seconds:Tighten the retainer plate nut
2 minute 48 seconds:Align the front and rear heat sealing plates up and down and left and right, and then tighten the fixing nuts of the heat sealing plate
3 minute 7 seconds:After the heating tube is completely pushed into the heating plate, lock the front and rear heating tube.
3 minute 22 seconds:Restore the tension spring in the rear nacelle
3 minute 33 seconds:Installation of rear waste edge punch mold,
3 minute 48 seconds:Align the cutting mold fixing plate with the top of the back plate and tighten the screws.
4 minute 1 seconds:When installing the cutting mold, install the copper bearing in the shaft sleeve and leave half of it.。
4 minute 13 seconds:Align the pattern of the front and rear cutting mold, otherwise the knives will be damaged.lock the fixing screw.
4 minute 24 seconds:Lock nut。
4 minute 35 seconds:Check and connect the air pipe and water pipe of each module
How To Change The Mold of FFS Machine
Step 1:Preparations before mold removal
Step 3: Install the forming mold
Step 4: Install the heat sealing mold and the scrap cutter
5 seconds:Install the filling head holder, do not tighten now
37 seconds:The electric heating tube is inserted into the back heat sealing mold, and the screws of the power cord are tightened
50 seconds:Fix the post-heat-seal module without tightening it first。
1 minute 14 seconds:The bottom of the rear heat sealing mold is 2-3mm higher than the upper guide rail, and then tighten it.
1 minute 52 seconds:Install the front heat-sealing mold, insert the heating tube, install the front heat-sealing mold fixing plate into the fixing screw, and align the screw step。
2 minute 8 seconds:Tighten the heating pipe wire nut
2 minute 17 seconds:Tighten the retainer plate nut
2 minute 48 seconds:Align the front and rear heat sealing plates up and down and left and right, and then tighten the fixing nuts of the heat sealing plate
3 minute 7 seconds:After the heating tube is completely pushed into the heating plate, lock the front and rear heating tube.
3 minute 22 seconds:Restore the tension spring in the rear nacelle
3 minute 33 seconds:Installation of rear waste edge punch mold,
3 minute 48 seconds:Align the cutting mold fixing plate with the top of the back plate and tighten the screws.
4 minute 1 seconds:When installing the cutting mold, install the copper bearing in the shaft sleeve and leave half of it.。
4 minute 13 seconds:Align the pattern of the front and rear cutting mold, otherwise the knives will be damaged.lock the fixing screw.
4 minute 24 seconds:Lock nut。
4 minute 35 seconds:Check and connect the air pipe and water pipe of each module