loading
GDS-118P5
Migrand
Availability: | |
---|---|
| |
How To Change The Mold of FFS Machine
Step 1:Preparations before mold removal
Step 3: Install the forming mold
Step 4: Install the heat sealing mold and the scrap cutter
Step 5: Install the Punching mold and roll film
5 seconds:When installing the rear blanking knife, the side of the knife that is flush with the back plate is installed to the right.
27 seconds:Once flush with the top of the back panel, screw in the two diagonally opposite set screws
42 seconds:The copper bearing is arranged in the shaft sleeve of the front punching and loading die and then arranged on the movable screw rod of the rear punching and cutting die;
51 seconds:When the front blanking die is installed, the cylinder faces to the right.
1 minute 3 seconds:Screw on the fixing nut, but do not tighten it first.
1 minute 14 seconds:The air pipe that always blows is connected to the rear connector, and the other air pipe that blows out during operation is connected to the front connector.
1 minute 30 seconds:Press "jog" to run the blanking die to the closed state.
1 minute 35 seconds:Install the positioning and clamping cylinder.
The upper clamping strip shall be parallel to the lower guide rail and located in the middle of the grooves of the front and rear impact molds.
The clamping strip shall be 2-3mm higher than the cutter and shall not contact with the cutter mold. Lock the screw.
2 minute 35 seconds:When the molding mold is closed,
adjust the position of the molding blowing module so that the alignment line of the blowing block is aligned with the edge of the molding mold,
and slightly tighten the screw
3 minute 10 seconds:Measure the distance from the back plate in the cabin to the center of the forming mold,
and adjust the center distance between the left rail and the back plate to be consistent with the former.
3 minute 38 seconds:Measure the distance from the back plate in the cabin to the center of the slitter edge blanking die,
and adjust the center distance between the right rail and the back plate to be consistent with the former.
3 minute 52 seconds:Before install the roll film, open the clamping cylinder.
4 minute 1 seconds:Load the wrapping roll film onto the machine track
5 minute 18 seconds:Close the clamping cylinder after the film install is completed.
5 minute 25 seconds:Turn on the 4 temperature buttons on the touch screen in turn and wait for the temperature to rise to the set value.
How To Change The Mold of FFS Machine
Step 1:Preparations before mold removal
Step 3: Install the forming mold
Step 4: Install the heat sealing mold and the scrap cutter
Step 5: Install the Punching mold and roll film
5 seconds:When installing the rear blanking knife, the side of the knife that is flush with the back plate is installed to the right.
27 seconds:Once flush with the top of the back panel, screw in the two diagonally opposite set screws
42 seconds:The copper bearing is arranged in the shaft sleeve of the front punching and loading die and then arranged on the movable screw rod of the rear punching and cutting die;
51 seconds:When the front blanking die is installed, the cylinder faces to the right.
1 minute 3 seconds:Screw on the fixing nut, but do not tighten it first.
1 minute 14 seconds:The air pipe that always blows is connected to the rear connector, and the other air pipe that blows out during operation is connected to the front connector.
1 minute 30 seconds:Press "jog" to run the blanking die to the closed state.
1 minute 35 seconds:Install the positioning and clamping cylinder.
The upper clamping strip shall be parallel to the lower guide rail and located in the middle of the grooves of the front and rear impact molds.
The clamping strip shall be 2-3mm higher than the cutter and shall not contact with the cutter mold. Lock the screw.
2 minute 35 seconds:When the molding mold is closed,
adjust the position of the molding blowing module so that the alignment line of the blowing block is aligned with the edge of the molding mold,
and slightly tighten the screw
3 minute 10 seconds:Measure the distance from the back plate in the cabin to the center of the forming mold,
and adjust the center distance between the left rail and the back plate to be consistent with the former.
3 minute 38 seconds:Measure the distance from the back plate in the cabin to the center of the slitter edge blanking die,
and adjust the center distance between the right rail and the back plate to be consistent with the former.
3 minute 52 seconds:Before install the roll film, open the clamping cylinder.
4 minute 1 seconds:Load the wrapping roll film onto the machine track
5 minute 18 seconds:Close the clamping cylinder after the film install is completed.
5 minute 25 seconds:Turn on the 4 temperature buttons on the touch screen in turn and wait for the temperature to rise to the set value.